Commissioning
1
Turn on the gas and electrical supply to the appliance.
2
Set the thermostat to maximum.
3
When ignition sequence begins, check that the igniter
glows red and the pilot lights.
4
The igniter should stop glowing when the pilot is lit.
5
Main burner lights.
6
Refit cover and make tidy.
7
Place the smart-lite upgrade label on the front
of the appliance, write the date installed and your
contact details.
8
Turn the thermostat to normal setting.
If
the ignition sequence is not as described in these instructions,
refer to the Service Section of the SmartValve
system Control Instructions for troubleshooting procedures.

We
strongly recommend that the installation is carried out
by a qualified gas appliance engineer.
Take
care to follow the recommended fitting instructions
carefully. Failure to do so will void the warranty and
maylead to personal injury or damage to property.
Fire
Hazard
Under no circumstances exceed the specified voltage
of 120 volts. Ensure that components do not come into
direct contact with water (for example, spray, dripping
water or rain). Improper and dangerous operation can
result from wiring errors.
Ensure that wiring is routed securely, and away from
any flame.
Shock
Hazard
Always turn off electric power before working on any
appliance. Ensure proper connection of line hot wires.
Explosion
Hazard
Shut off main gas to appliance before installation begins,
and do not reconnect until installation is complete.
|